Challenge
ABC Auto Parts faced frequent overheating in their robotic welding lines, causing downtime and inconsistent product quality. Their existing chiller system was energy-inefficient (+30% energy waste) and couldn’t handle peak summer loads.
Solution
We installed a customized 100-ton industrial water chiller with:
✔ Variable Speed Compressors – Reduced energy consumption by 40% vs. fixed-speed models.
✔ IoT Monitoring – Real-time diagnostics via cloud-based dashboard.
✔ Corrosion-Resistant Evaporator – Extended lifespan in high-humidity environments.
Results
-
99.8% uptime (vs. 92% previously) during peak production.
-
$18,500/year energy savings (ROI achieved in 2.1 years).
-
Zero thermal shutdowns even at 95°F ambient temperatures.